Paragraphs in "Agreement Concerning A Joint Project For Planning, Design, Experiment, Preparation, Performance And Reporting Of Reactor Safety Experiments Concerning Containment Response" coded as SCOP
Displaying 1 - 16 of 16
| Label | Provision |
|---|---|
| Art.3 | III SCOPE OF THE PROJECT |
| Art.3.1x | The scope of the project is to prepare and perform containment response tests at Marviken within the framework of an international cooperation. |
| Art.3.2x | The project will be performed according to Appendices A-F and will aim at providing the contracting parties with further information mainly on certain dynamic phenomena in connection with containment blowdown situations. |
| Art.3.3x | The framework of the project is laid down in the appendices to this Agreement: |
| Art.3.3x.ax | Appendix A Description of programmes |
| Art.3.3x.bx | Appendix B Instrumentation |
| Art.3.3x.cx | Appendix C Organization |
| Art.3.3x.dx | Appendix D Budget |
| Art.3.3x.ex | Appendix E Time schedule |
| Art.3.3x.fx | Appendix F Reports |
| Art.3.4x | The project consists of three kinds of activities: |
| Art.3.4x.a | a) planning and design |
| Art.3.4x.b | b) experiment preparation and performance of the test programme and |
| Art.3.4x.c | c) data reduction and reporting of data and interpretation of results |
| Art.3.5x | The description in Appendix A reflects the fact that a certain minimum number of tests is necessary for the programme to be meaningful. It is consequently agreed that a minimum of 8 blowdown tests (blowdowns Nos 17 - 24) within the programme to be specified in accordance with Appendix A shall be performed. |
| Art.3.6x | The time schedule contains reserve time which partly is intended for repetition of experiments if needed. |