Paragraphs in "Convention Creating The Niger Basin Authority" coded as SCIR
Displaying 1 - 9 of 9
| Label | Provision |
|---|---|
| Art.4.1.d | (d) The initiating and monitoring of an orderly and rational regional policy for the utilization of the surface and underground waters in the Basin. |
| Art.4.1.e | (e) The designing and conduct of studies, research and surveys. |
| Art.4.2.a.i | (i)Collection, centralization, standardization, exploitation, dissemination, exchange of technical and related data; |
| Art.4.2.a.ii | (ii) Co-ordination of plans, projects and research carried out in the member States; |
| Art.4.2.a.iii | (iii) Consideration of projects presented by the member States with a view to making recommendations on co-ordinated programmes of research and implementation; |
| Art.4.2.a.iv | (iv) Monitoring of research and works undertaken by member States and subsequent exploitation of reports which such States should submit periodically; |
| Art.4.2.b.i | (i)Designing, study and construction of hydraulic multi- purpose structures of all types and sizes; |
| Art.4.2.b.ii | (ii) Designing, study and construction of works, plants and projects in the fields of transports and communications; |
| Art.4.2.g.ix | Applying for financial and technical assistance on a bilateral, multilateral or international basis for carrying out studies and works for the development of the Niger River Basin and to that effect conclude agreements, provided that agreements involving financial commitments for the member States become effective only after approval by the Council of Ministers. |